Monday, 24 June 2013

Link & evaluation.

This is the link to our finished re-make video =
http://www.youtube.com/watch?v=rWSTNqpg0RI 

I think there are strong and weak points to our video, here they are:
- A weakness is the camera movement as it is not exactly the same to that of the official A-Team video.
- A strength is the mise-en-scene as it was as close as we could possible get to the real mise-en-scene of the official video. 
- Another strength is the timing of the video we made fits in with the timings of the official video. 


Thursday, 13 June 2013

Filming Schedule

Friday 14th June 2013 - 9am until 10:10am.
Monday 17th June 2013 (If needed) - 2:50pm until 4pm.

Timings of edits in The A-Team music video

The timings of the video

0.25 – edit one

0.27 – edit two

0.31 – edit three

0.33 – edit four

0.35 – edit five

0.38 – edit six

0.42 – edit seven

0.45 – edit eight

0.47 – edit nine

0.51 – edit ten

Friday, 7 June 2013